Project overview

In 2018, a 16-person ProForce Industry team carried out piping installation and welding work at an LNG terminal. The project lasted 40 weeks.

Materials and scope of work

The project used EN 1.4307 stainless steel. The piping installed and welded ranged in nominal diameter from DN15 to DN350.

The team’s work included installing piping and welding pipe joints.

Project facts

  • Year: 2018
  • Facility: LNG terminal
  • Work: piping installation and welding
  • Material: EN 1.4307 stainless steel
  • Nominal pipe diameters: DN15–DN350
  • Team size: 16 people
  • Project duration: 40 weeks