Year: 2018 Material: 1.4307 Pipeline: DN15–DN350
Scope of work: The installation and welding of the pipelines of an LNG terminal
Year: 2019-2020 Materials: Duplex, Super duplex, Alloy steels Scope of work: Assembly and welding of Marine Scrubbers
Year: 2020 Materials: EN1.4462; EN1.4362 Material thickness: 8–25 mm
Scope of work: Manufacturing of complex pressure tanks (assembly and welding) for the oil industry
Year: 2020 Material: S355J2 Material thickness: 8–25 mm
Scope of work: The welding works of a district heating accumulator
Year: 2021-2022
People working: 60 people
Hours: 57,650h
Materials: 316Ti
Scope of work: Preparation, Installation and welding of Cruise Ship LNG Piping
Year: 2020 Materials: Shell P265GH. Pipes: P235GH Material thickness: 10–25 mm
Year: 2020 Material: P235GH Pipeline: DN15–DN400
Scope of work: The installation and welding of the pipelines for an electricity and boiler plant
Year: 2020 Materials: 1.4162; 1.4362 Material thickness: 4–25 mm
Scope of work: The manufacturing of the evaporator units at the workshop and on-site installation
Year: 2020 Materials: 1.4307, 1.4404, 1.4462 Pipeline: DN40–DN350
Scope of work: The installation and welding of the pipelines of a pulp factory
Year: 2020 Materials: Stainless steel, duplx steel
Scope of work: Assembly and welding of evaporators.
Year: 2020 Materials: Shell 1.4307. Pipes: 1.4404 Material thickness: 6–25 mm